Related
- University tests feasibility of future projects
- School on double duty after collapse
- Blacksburg, university strive for construction certifications
TOPICS: construction, burruss hall
The pedestrian tunnel underBurruss Hall is closed for repairs until Mar. 19.
According to a campus notice, University Planning, Design, and Construction shut down the tunnel on Feb. 6 to demolish the tunnel area’s concrete.
Both entrances remain open, but two sets of gates in the center section and yellow caution tape on the side facing McBryde seal off the remainder.
The CNS switch room and Preventative Maintenance office are the two areas primarily affected by the renovations.


Leave a comment 1 Comment Write a letter to the editor
All letters to the editor must include a name, e-mail, daytime phone number and affiliation to Virginia Tech. Affiliation includes: year and major for students; position and department for faculty and staff; current city for alumni and parents.
By submitting your comment, you agree that it will not:
Comments that violate these guidelines will be moderated by the public editor and will then be buried in the comments section.
This comment has been buried by moderation (show comment)
Top