Each 40-foot hybrid diesel-electric bus cost the BT $545,000.
The Blacksburg Transit recently invested more than $2.8 million into nine new diesel-electric hybrid buses in an attempt to improve public transportation in Blacksburg.
Seven of these new vehicles are standard size buses with comparable capacity to those currently part of the BT fleet. The other two buses are articulated vehicles, which are approximately 60 feet in length.
Articulated buses are made of two separate and connected parts, allowing the bus to bend in the middle. The BT has not received the articulated buses yet, so the exact capacity is currently unknown. Generally, the capacity of an articulated bus is more than 100 passengers.
Fiona Rhodes, marketing specialist for the Blacksburg Transit, said the articulated buses would be important for the BT because they remove another car from the road and eliminate overcrowding on buses.
“I think it is a positive change for everyone involved — riders and residents alike,” she said.
Rhodes said the buses were purchased to not only replace older buses, but to expand on the current fleet.
“I believe all of the buses, particularly the 60 feet long ones, are going to be a great addition to the BT fleet,” said Deborah Freed, alternative transportation manager for Virginia Tech.
The initial costs of the hybrid electric buses are higher, but long-term maintenance costs are lower. Therefore, Rhodes said, the costs are expected to balance out.
Each of the 60-foot long articulated buses cost $871,000. Each of the 40-foot long buses cost $545,000. In comparison, older, non-hybrid buses cost $358,000 per vehicle.
The BT and Tech funded the buses by working together to replace old buses with environmentally friendly alternatives. State and federal funds paid for a portion of the buses and Tech matched this amount. This money came from student transit fees, faculty and staff transportation and portion of every parking permit purchased, Freed said.
However, Freed said transit fees would not increase because of purchases made by the BT.
“If the transit fee goes up it would not be because of the new buses,” she said.
Freed believes the new buses will provide an effective and stress-free way to get to and from campus. Tech is hoping to increase the carrying capacity, look at areas with overcrowding and eliminate pass-bys with these additional buses.
All nine of the buses, including the articulated vehicles, are hybrid electric buses. The BT chose to purchase hybrid electric vehicles as part of the town of Blacksburg’s “green” initiative, Rhodes said. She said the buses, running on electric power, would maintain a better fuel economy and have a positive impact on the environment.
Rhodes said this initiative “encourages us to look at alternative fuels that are better for the environment.”
Tech also supports this initiative and the BT’s move to cleaner vehicles, according to Freed. She said that Tech faced a steep raise in diesel fuel prices several years ago, requiring Tech to lessen its dependency on this fuel.
“In times where people are becoming more dependent on public transportation, it is really exciting that the Blacksburg Transit and Virginia Tech are offering enhancements to transit service,” Freed said.
The BT plans to have most of the buses on the road in the fall semester. This will depend on the delivery and preparation of the articulated buses. However, routes may change, so Freed encourages regular riders to check the BT website for alterations.
A version of this article appeared in the Jul 22 issue of the Collegiate Times.

Leave a comment 12 Comments Write a letter to the editor
All letters to the editor must include a name, e-mail, daytime phone number and affiliation to Virginia Tech. Affiliation includes: year and major for students; position and department for faculty and staff; current city for alumni and parents.
Good for the BT and VT as a whole. I wish the DC Metro would do a better job of removing older buses and replacing them with more cost efficient ones. One can dream...
Reply to this Top
Believe it or not, they are. WMATA (or DC Metro, as you call it) purchased several hundred New Flyer hybrid buses this past year, and has recently relegated their oldest buses (1990-1995 Flxible Metros) to Ready Reserve status, which means they stay off the road unless there is an emergency or shortage of buses. This makes me sad as the Flxibles are my favorite DC buses. :(
Reply to this Top
Believe it or not, they are. WMATA (or DC Metro, as you call it) purchased several hundred New Flyer hybrid buses this past year, and has recently relegated their oldest buses (1990-1995 Flxible Metros) to Ready Reserve status, which means they stay off the road unless there is an emergency or shortage of buses. This makes me sad as the Flxibles are my favorite DC buses. :(
Reply to this Top
Believe it or not, they are. WMATA (or DC Metro, as you call it) purchased several hundred New Flyer hybrid buses this past year, and has recently relegated their oldest buses (1990-1995 Flxible Metros) to Ready Reserve status, which means they stay off the road unless there is an emergency or shortage of buses. This makes me sad as the Flxibles are my favorite DC buses. :(
Reply to this Top
woahh we do have plenty of new buses we have like 300 New Flyer DE42LFAs and we are getting more new buses!
Reply to this Top
Two $871,000 articulated buses and seven $545,000 40-ft buses adds up to $5.6 million. Who paid for the other $2.8 million?
Reply to this Top
"State and federal funds paid for a portion of the buses and Tech matched this amount." What this means is BT paid 2.6 of the 5.6 you calculated.
-The Friendly Reader
"I read the article so you don't have to!"
Reply to this Top
Too funny Friendly Reader
Top
This is good news, I really don't think I'll buy a parking pass now. I may give the BT another try this semester. Hopefully it'll fix some of the overcrowding issues which is why I left the BT last year.
Reply to this Top
They really are investing in the right place, I think public transportation esp with all this construction going on is a must for blacksburg. It's already better than most small towns but hopefully the buses won't be as packed with more buses in the system now. AND they are cleaner.
I can't way to ride one of those 60ft buses. That will be interesting.
Reply to this Top
Way to go, Blacksburg! Love this town more every day.
Reply to this Top
The new 60ft buses would really help the Foxridge runs in the morning
Reply to this Top